Open Net Zero logo

Filters

Formats:
Select...
Licenses:
Select...
Organizations:
Select...
Tags:
Select...
Shared:
Sensitivities:
Datasets
L o a d i n g
New production units for self-consumption

Number of new Small Production Units (UPAC) completed by municipality and connection power.1. The information made available by E-REDES constitutes an approximation to the values ​​taken from the system and is based on the moment in which it is collected. Given that the connection points, the electricity distribution network, and the consumption and production values ​​themselves are naturally very dynamic, it is safeguarded that the information made available may be subject to subsequent changes and updates, with the exception of any omissions and/or occasional inaccuracies of location that the information may contain.2. In this way, E-REDES is not liable to third parties, namely, partners, service providers, contractors, users and customers, for damages that may arise as a result, direct or indirect, of the use of this Information, in particular when carrying out interventions, calculations and/or estimates, without confirming the accuracy and updating of the data, whereby it is duly noted that the consultation of this information does not affect the duty to promote a direct consultation with E-REDES in order to obtain updated information.

0
No licence known
Tags:
homepage
Formats:
JSONCSV
EP - Electricidade de Portugal (E-REDES)over 1 year ago
Number of active energy contracts by meter type

Number of energy contracts by type of meter (smart or non-smart meter), by District, municipality and parish.Only active contracts are considered.1. The information made available by E-REDES constitutes an approximation to the values ​​taken from the system and is based on the moment in which it is collected. Given that the connection points, the electricity distribution network, and the consumption and production values ​​themselves are naturally very dynamic, it is safeguarded that the information made available may be subject to subsequent changes and updates, with the exception of any omissions and/or occasional inaccuracies of location that the information may contain.2. In this way, E-REDES is not liable to third parties, namely, partners, service providers, contractors, users and customers, for damages that may arise as a result, direct or indirect, of the use of this Information, in particular when carrying out interventions, calculations and/or estimates, without confirming the accuracy and updating of the data, whereby it is duly noted that the consultation of this information does not affect the duty to promote a direct consultation with E-REDES to obtain updated information.

0
No licence known
Tags:
homepage
Formats:
JSONCSV
EP - Electricidade de Portugal (E-REDES)over 1 year ago
Number of low voltage consumption locations with Remote Reads

Number of low voltage consumption sites with remote readings collected from smart meters, by district, municipality and parish. History >2022For the municipality of Évora, the data collection of remote readings and load diagrams do not include CPE with 1st generation meters, as this equipment is being progressively replaced until the end of 2024.1. The information made available by E-REDES constitutes an approximation to the values ​​taken from the system and is based on the moment in which it is collected. Given that the connection points, the electricity distribution network, and the consumption and production values ​​themselves are naturally very dynamic, it is safeguarded that the information made available may be subject to subsequent changes and updates, with the exception of any omissions and/or occasional inaccuracies of location that the information may contain.2. In this way, E-REDES is not liable to third parties, namely, partners, service providers, contractors, users and customers, for damages that may arise as a result, direct or indirect, of the use of this Information, in particular when carrying out interventions, calculations and/or estimates, without confirming the accuracy and updating of the data, whereby it is duly noted that the consultation of this information does not affect the duty to promote a direct consultation with E-REDES to obtain updated information.

0
No licence known
Tags:
homepage
Formats:
JSONCSV
EP - Electricidade de Portugal (E-REDES)over 1 year ago