Open Net Zero logo

Filters

Formats:
Select...
Licenses:
Select...
Organizations:
Select...
Tags:
Select...
Shared:
Sensitivities:
Datasets
L o a d i n g
Melbourne Wastewater - Daily Volume Received by Melbourne WaterSource

This data provides daily accumulated inflow volumes for wastewater treatment at the two Melbourne Water site (Western and Eastern). This data is collected using network flow monitoring devices. This data has been processed and stored as official inflow volumes received by Melbourne Water over a 24 hour period (12am to 12am). Wastewater volume is the total accumulated flow received from the sewer and stormwater networks. This data set is best used in long and short term wastewater services demand analysis. NOTE: Whilst every effort has been taken in collecting, validating and providing the attached data, Melbourne Water Corporation makes no representations or guarantees as to the accuracy or completeness of this data. Any person or group that uses this data does so at its own risk and should make their own assessment and investigations as to the suitability and/or application of the data. Melbourne Water Corporation shall not be liable in any way to any person or group for loss of any kind including damages, costs, interest, loss of profits or special loss or damage, arising from any use, error, inaccuracy, incompleteness or other defect in this data.

0
No licence known
Tags:
dailyeastern treatment plantflowratemelbournesewageseweragestormwatertransfer networkvolumewastewaterwestern treatment plantwholesale
Formats:
HTMLArcGIS GeoServices REST APICSVGeoJSON
Melbourne Water Corporation5 months ago
Newberry Well 55-29 Stimulation Data 2014Source

The Newberry Volcano EGS Demonstration in central Oregon, a 5 year project begun in 2010, tests recent technological advances designed to reduce the cost of power generated by EGS in a hot, dry well (NWG 55-29) drilled in 2008. First, the stimulation pumps used were designed to run for weeks and deliver large volumes of water at moderate well-head pressure. Second, to stimulate multiple zones, AltaRock developed thermo-degradable zonal isolation materials (TZIMs) to seal off fractures in a geothermal well to stimulate secondary and tertiary fracture zones. The TZIMs degrade within weeks, resulting in an optimized injection/ production profile of the entire well. Third, the project followed a project-specific Induced Seismicity Mitigation Plan (ISMP) to evaluate, monitor for, and mitigate felt induced seismicity. An initial stimulation was conducted in 2012 and continued for 7 weeks, with over 41,000 m3 of water injected. Further analysis indicated a shallow casing leak and an unstable formation in the open hole. The well was repaired with a shallow casing tieback and perforated liner in the open hole and re-stimulated in 2014. The second stimulation started September 23rd, 2014 and continued for 3 weeks with over 9,500 m3 of water injected. The well was treated with several batches of newly tested TZIM diverter materials and a newly designed Diverter Injection Vessel Assembly (DIVA), which was the main modification to the original injection system design used in 2012. A second round of stimulation that included two perforation shots and additional batches of TZIM was conducted on November 11th, 2014 for 9 days with an additional 4,000 m3 of water injected. The stimulations resulted in a 3-4 fold increase in injectivity, and PTS data indicates partial blocking and creation of flow zones near the bottom of the well. This submission includes all of the files and reports associated with the stimulation, pressure testing, and monitoring included in the scope of the project.

0
No licence known
Tags:
Enhanced Geothermal System Newberry Volcano TOUGHREACT201455-29AltaRockChemicalDTSDaily ReportDemonstrationDiverter MaterialDownhole pressureEGSELHSFlow TestFoulger ConsultingGRCGeochemistryGroundwater MonitoringHydrologicalISTIInjectionMEQMechanicalMicroseismic MonitoringNEWWNN-17NN-18NewberryPCGPLHSPNSNPTSPTS dataPad 16Pad 29Pad-16Pad-29PresentationPressure Fall-OffPublicationsResultsSGWSeismicStanfordStimulationTemperature MonitoringThermalVCVolcanoWHPWHTWeir BoxWell Constructionaddendumanalysisbackflow reportcasingchartclustereddatadeptheventfield temperaturefinal reportflow dataflow rateflowrategas chemistrygeothermalgraphground watergroundwaterhole depthsinduced seismicityinduced seismisityinjectivitylocationsmanual readingsmicroseismicitymitigationmonitoring dataoperations summaryoutputpaperplanpresssurepressure dataproduction wellprofilerawreportschematicseismic dataspinnerstimulation datasurface watersurveytemperaturetemperature at depthultrasonicwell datawell head pressurewellbore
Formats:
PDFdatJPEGXLSXPPTXXLSDOCXTXTrelocoutCSVZIP
National Renewable Energy Laboratory (NREL)about 1 year ago
Wastewater Inlet - Hourly Flow - Eastern Treatment Plant (ETP)Source

The Eastern Treatment Plant (ETP) receives sewage from the eastern side of Melbourne. This file describes the volume of sewage pumped through ETP on an hourly basis.NOTE. Whilst every effort has been taken in collecting, validating and providing the attached data, Melbourne Water Corporation makes no representations or guarantees as to the accuracy or completeness of this data. Any person or group that uses this data does so at its own risk and should make their own assessment and investigations as to the suitability and/or application of the data. Melbourne Water Corporation shall not be liable in any way to any person or group for loss of any kind including damages, costs, interest, loss of profits or special loss or damage, arising from any use, error, inaccuracy, incompleteness or other defect in this data.

0
No licence known
Tags:
eastern treatment plantflowratemelbournesewageseweragestormwatertransfer networkvolumewastewaterwholesale
Formats:
HTMLArcGIS GeoServices REST APICSVGeoJSON
Melbourne Water Corporation5 months ago
Wastewater Outlet - Hourly Flow - Eastern Treatment Plant (ETP)Source

The Eastern Treatment Plant (ETP) discharges treated effluent  in accordance with EPA Victoria licence AL74284 to an ocean outfall at Boag Rocks. This file contains hourly flowrate data at the treatment plant pumpstation. From the pumpstation, the effluent takes several hours (typically 4-8 h) to reach the ocean.NOTE. Whilst every effort has been taken in collecting, validating and providing the attached data, Melbourne Water Corporation makes no representations or guarantees as to the accuracy or completeness of this data. Any person or group that uses this data does so at its own risk and should make their own assessment and investigations as to the suitability and/or application of the data. Melbourne Water Corporation shall not be liable in any way to any person or group for loss of any kind including damages, costs, interest, loss of profits or special loss or damage, arising from any use, error, inaccuracy, incompleteness or other defect in this data.

0
No licence known
Tags:
eastern treatment plantflowratemelbournesewageseweragetreatmentvolumewastewater
Formats:
HTMLArcGIS GeoServices REST APICSVGeoJSON
Melbourne Water Corporation5 months ago