Open Net Zero logo
Advanced TidGen Power System - Preliminary IO&M and Testing Plan
OwnerNational Renewable Energy Laboratory (NREL) - view all
Update frequencyunknown
Last updatedabout 1 year ago
Format
Overview

The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU) device. This submission includes the preliminary Installation, Operation & Maintenance (IO&M) and testing plan. In 2012, the first TidGen device was installed in Cobscook Bay utilizing a piled foundation, which required extensive, costly geotechnical survey and on-water effort on the order of several weeks to install the system. The Advanced TidGen 2.0 Power System has adapted the Buoyant Tensioned Mooring System (BTMS) that reduces on-water deployment time to within a tidal cycle. The device has been designed to match the resources typically available in remote regions, such as Igiugig, Alaska, which are the immediate commercial market for ORPC's technology. The system has been designed to meet requirements throughout the entire lifecycle concept of operations.

CECHydrokineticIOMMHKMarineORPCTidGencostcross flow turbinecross-flow turbinecurrenteconomicsemissionenergyfinancesfreeinstallationmaintenancemooring systemoceanoperationpowershore-side powersmart gridtechnologytest plantestingtidaltidal currentturbine generator unit
Additional Information
KeyValue
dcat_issued2018-06-14T06:00:00Z
dcat_modified2023-06-14T08:00:01Z
dcat_publisher_nameOcean Renewable Power Company
guidhttps://data.openei.org/submissions/5877
ib1_trust_framework[]
language
Files
  • PDF
    Preliminary IOM and Test Plan.pdf
Share this Dataset
advanced-tidgen-power-system-preliminary-iom-and-testing-plan
Access and Licensing
Access conditionsAccess control: Unknown
License conditionsLicense: