OwnerNational Renewable Energy Laboratory (NREL) - view all
Update frequencyunknown
Last updatedabout 1 year ago
OverviewFMECAHawaiiHydrokineticMHKMarineRenewableRisk RegisterWECWave Energy Converterabsorberanalysiscpwrcriticalitydesigndevelopmentenergyfailure modehullmooringpointpoint absorber buoypower take offprocessptorisk reductionscadastingraysupervisory control and data acquisitiontechnologywave
Analysis method to systematically identify all potential failure modes and their effects on the Stingray WEC system. This analysis is incorporated early in the development cycle such that the mitigation of the identified failure modes can be achieved cost effectively and efficiently. The FMECA can begin once there is enough detail to functions and failure modes of a given system, and its interfaces with other systems. The FMECA occurs coincidently with the design process and is an iterative process which allows for design changes to overcome deficiencies in the analysis. Risk Registers for major subsystems were completed in compliance with the DOE Risk Management Framework developed by NREL (document included below).
Additional Information
KeyValue
dcat_issued2016-07-25T06:00:00Z
dcat_modified2020-06-29T20:47:03Z
dcat_publisher_nameColumbia Power Technologies, Inc.
guidhttps://data.openei.org/submissions/4136
ib1_trust_framework[]
language
Files
- XLSXRisk Register - Hull.xlsx
- XLSXRisk Register - PTO.xlsx
- XLSXRisk Register - Electric Plant.xlsx
- XLSXRisk Register - SCADA.xlsx
- XLSXRisk Register - Ballast Control.xlsx
- XLSXRisk Register - Safety.xlsx
- XLSXRisk Register - Climate Control.xlsx
- XLSXRisk Register - Station Power.xlsx
- XLSXRisk Register - Cooling System.xlsx
- XLSXRisk Register - Bilge.xlsx
- XLSXRisk Register - Surveillance.xlsx
- XLSXRisk Register - Outfit Furnishings.xlsx
- XLSXRisk Register - Hull Fitting.xlsx
- XLSXRisk Register - Hull Penetrations.xlsx
- XLSXRisk Register - Marinization Corrosion.xlsx
- XLSXRisk Register - Mooring.xlsx
- XLSXRisk Register - Electrical Collection.xlsx
- PDFDOE Risk Management Framework.pdf