Open Net Zero logo
UOU2T3YW
OwnerElexon - view all
Update frequencyunknown
Last updated7 months ago
Format
Overview

This endpoint forward view of availability (also referred to as Output Useable data under the Grid Code) for generation and interconnector capacity, accounting for planned outages covering availability data from 2 weeks ahead to 156 weeks ahead; it is aggregated by Balancing Mechanism Units (BMUs). In the context of this report, BMUs can be considered as generating units. Elexon BMUs differs from NGC BMUs by including a prefix e.g. 'T_'. The mapping between NGC and Elexon BMUs can be retrieved via reference data API endpoints.

BM UnitBMUaggregatedaheadassetavailabilitycapacityforecastfuelgenerationinterconnectoroutput useableplanned outagestransmissionunit
Additional Information
KeyValue
dcat:versionNotesInitial test
oe:sensitivityClassOE-O
Files
Share this Dataset
oe-03782949-elexon_insights_uou2t3yw
Access and Licensing
Access conditionsAccess control: Unknown
License conditionsLicense: